Services · Casa Verde 2026

A battery for your home,
funded by AFM.

The AFM storage programme 2026 funds batteries for prosumers who already have a photovoltaic system: up to 15,000 lei per home. We take the project from the first check to the installed battery.

75%
maximum funding of the project value
15.000 lei
ceiling per beneficiary, VAT included
10 kWh
minimum battery capacity
1.500 lei/kWh
maximum eligible cost, VAT included
What we do

From the first check
to the installed battery.

01

System check

We look at your existing PV system and inverter and tell you whether it can take a battery as it is, or whether a hybrid inverter has to be part of the project.

02

Configuration for the score

Applications are ranked by score, not by who applies first. We size the battery and your own contribution so the project scores as high as your budget allows.

03

Offer and paperwork

You receive a clear offer for the battery, the inverter if needed, and installation. We help you with the application file and with the documents the programme asks for.

04

Installation and commissioning

We install the battery and, where needed, the hybrid inverter, commission the system and help you update the grid connection certificate.

Score simulator

How many points would your project get?

On our programme page you enter the battery and your budget and see the AFM funding, your own contribution and the score, under both the rules in force and the proposed changes. You can also request an offer from there. The page is in Romanian.

Open the simulator →
How the programme works

Five steps,
from application to settlement.

  1. Step 1

    Application

    You fill in the application in the AFM app and upload the documents. You declare your own contribution and the battery capacity.

  2. Step 2

    Selection

    After the session closes, applications are ranked by score and approved within the available budget.

  3. Step 3

    You choose the installer

    In the app you select an installer validated by AFM, who takes over the project.

  4. Step 4

    Installation

    The battery and, if needed, the hybrid inverter are installed. The grid connection certificate is updated.

  5. Step 5

    Settlement

    You pay only your own contribution. The installer collects the funding directly from AFM.

The programme is run by Administrația Fondului pentru Mediu (AFM). The figures above follow the funding guide approved by Order no. 1.904/2026 and can change if the guide is amended. The official score is the one calculated by the AFM application.